ZHCSSS9A march 2023 – august 2023 AM62A3 , AM62A3-Q1 , AM62A7 , AM62A7-Q1
PRODUCTION DATA
This section describes the power supply requirements to ensure proper device operation.
All power balls must be supplied with the voltages specified in the Recommended Operating Conditions section, unless otherwise specified in Signal Descriptions and Pin Connectivity Requirements.