ZHCSP44D October 2021 – October 2024 DLP160CP
PRODUCTION DATA
PARAMETER | MIN | MAX | UNIT | |
---|---|---|---|---|
tDELAY | Delay requirement from VOFFSET power up to VBIAS power up | 2 | ms | |
VOFFSET | The supply voltage level at the beginning of power-up sequence delay | 6 | V | |
VBIAS | The supply voltage level at end of power-up sequence delay | 6 | V |