ZHCSJE6C february 2019 – july 2023 DLP2010
PRODUCTION DATA
The following power supplies are all required to operate the DMD:
The DLPAxxxx device strictly controls the DMD power-up and power-down sequences as described in Figure 9-1.
To ensure reliable operation of the DMD, follow the power supply sequencing requirements described in this section. Failure to adhere to any of these requirements can result in a significant reduction in the DMD reliability and lifetime.
VBIAS, VDD, VDDI, VOFFSET, and VRESET power supplies must be coordinated during power-up and power-down operations . Common ground (VSS) to all lines must also be connected.