1. ±8.75-V delta, ∆V, shall be considered the max operating delta between VBIAS and VOFFSET. Customers may find that the most reliable way to ensure this is to power VOFFSET prior to VBIAS during power up and to remove VBIAS prior to VOFFSET during power down.
Figure 19. Power Supply Sequencing Requirements (Power Up and Power Down)