4 Revision History
Changes from Revision B (November 2022) to Revision C (December 2022)
- 将 ESD1LIN24-Q1 和 ESD761-Q1 器件的状态从预告信息 更改为“量产数据”
Go
Changes from Revision A (September 2022) to Revision B (November 2022)
- 将 ESD751-Q1 器件的状态从预告信息 更改为量产数据
Go
Changes from Revision * (September 2022) to Revision A (September 2022)
- Updated the IPP
values in the Clamping Voltage sectionGo
- Changed SOT-323 and SOT-523 to SOD-323 and SOD-523
Go