4 修订历史记录
Changes from E Revision (August 2016) to F Revision
-
Changed From: CLKout3_PD = 0 To: CLKout2_PD = 0 in Table 7Go
-
Changed From: CLKout3_PD = 0 To: CLKout2_PD = 0 in Table 9Go
Changes from D Revision (May 2013) to E Revision
-
Changed 750 到 500Go
-
Changed 2.26MHz 至 284kHzGo
-
Added ESD 额定值表,特性 说明 部分,器件功能模式,应用和实施部分,电源相关建议部分,布局部分,器件和文档支持部分以及机械、封装和可订购信息部分Go
-
Changed Clock Switch Event With Holdover section.Go
-
Deleted Clock Switch Event without Holdover section.Go
-
Changed 5 cycles to 5.5 cyclesGo
-
Changed 5 cycles to 5.5 cyclesGo
-
Added (Auto modes only).Go
-
Changed equationGo
Changes from C Revision (May 2013) to D Revision
-
Changed layout of National Semiconductor Data Sheet to TI format.Go