10 Revision History
Changes from Revision D (October 2021) to Revision E (December 2023)
- Added the I/Os with Integrated Static Pull-Down Resistors
sectionGo
Changes from Revision C (September 2020) to Revision D (October 2021)
- Updated the Pin Configuration and Functions section to include
DRL and DEA packagesGo
Changes from Revision B (June 2018) to Revision C (September 2020)
- 更新了整个文档中的表格、图和交叉参考的编号格式Go
- 将所有表更新为最新的 3d 表格式Go
- Updated ICCA, ICCB, and ICCA + ICCB to reflect updated performance of device.Go
Changes from Revision A (April 2018) to Revision B (June 2018)
- 添加了 DEA 和 DTQ 作为可用封装选项Go
- 将米6体育平台手机版_好二三四状态从“量产混合”更改为“量产数据”Go
Changes from Revision * (December 2017) to Revision A (April 2018)
- Added pinout drawing for DEA package Go
- Added pinout drawing for DTQ package Go