ZHCSMU9A December 2020 – September 2021 TAS2764
PRODUCTION DATA
There are no power sequencing requirements for order of the supplies other than PVDD and VBAT1S. During power up and power down PVDD voltage must be greater than (VBAT1S-0.7V). See Section 11 for details.