ZHCSEK6A January 2015 – September 2018 TPL5010
PRODUCTION DATA.
During start-up after POR, the TPL5010 executes a one-time measurement of the resistance attached to the DELAY/M_RST pin to determine the desired time interval for WAKE. This measurement interval is tR_EXT. During this measurement, a constant current is temporarily flowing into REXT.