ZHCSHV0C June 2017 – April 2018 TPS2595
PRODUCTION DATA.
The designer must know the following:
This design procedure seeks to control the junction temperature of device under both static and transient conditions by proper selection of output ramp-up time and associated support components. The designer can adjust this procedure to fit the application and design criteria.