ZHCSKH2 November 2019 TPS7A52
ADVANCE INFORMATION for pre-production products; subject to change without notice.
Soft start directly controls the output start-up time and indirectly controls the output current during start-up (inrush current).
As shown in Figure 2, the external capacitor at the NR/SS pin (CNR/SS) sets the output start-up time by setting the rise time of the internal reference (VNR/SS).