ZHCSOH8F July 2021 – August 2024 TPS7H5001-SP , TPS7H5002-SP , TPS7H5003-SP , TPS7H5004-SP
PRODUCTION DATA
请参考 PDF 数据表获取器件具体的封装图。
Before the primary outputs of the controller will start switching, the following conditions must be met:
Once all of the aforementioned conditions are satisfied, the soft-start process will be initiated.