4 Revision History
Changes from Revision A (September 2021) to Revision B (January 2022)
- 删除了 VQFN-HR 封装预发布说明Go
- Updated ESD Ratings table with correct description for CDM
testingGo
Changes from Revision * (May 2020) to Revision A (September 2021)
- 更新了整个文档中的表格、图和交叉参考的编号格式Go
- 添加了 VQFN-HR 封装信息Go
- 添加了 VQFN-HR 封装信息Go
- Add VQFN-HR package informationGo
- Added VQFN-HR package informationGo