ZHCST15 September   2023 TUSB211A

PRODUCTION DATA  

  1.   1
  2. 特性
  3. 应用
  4. 说明
  5. Revision History
  6. Pin Configuration and Functions
  7. Specifications
    1. 6.1 Absolute Maximum Ratings
    2. 6.2 ESD Ratings
    3. 6.3 Recommended Operating Conditions
    4. 6.4 Thermal Information
    5. 6.5 Electrical Characteristics
    6. 6.6 Switching Characteristics
    7. 6.7 Timing Requirements
    8. 6.8 Typical Characteristics
  8. Detailed Description
    1. 7.1 Overview
    2. 7.2 Functional Block Diagram
    3. 7.3 Feature Description
      1. 7.3.1 High-Speed EQ
    4. 7.4 Device Functional Modes
      1. 7.4.1 Low-Speed (LS) Mode
      2. 7.4.2 Full-Speed (FS) Mode
      3. 7.4.3 High-Speed (HS) Mode
      4. 7.4.4 High-Speed Downstream Port Electrical Compliance Test Mode
      5. 7.4.5 Shutdown Mode
  9. Application and Implementation
    1. 8.1 Application Information
    2. 8.2 Typical Application
      1. 8.2.1 Design Requirements
      2. 8.2.2 Detailed Design Procedure
        1. 8.2.2.1 Test Procedure to Construct USB High-Speed Eye Diagram
          1. 8.2.2.1.1 For a Host Side Application
          2. 8.2.2.1.2 For a Device Side Application
      3. 8.2.3 Application Curves
    3. 8.3 Power Supply Recommendations
    4. 8.4 Layout
      1. 8.4.1 Layout Guidelines
      2. 8.4.2 Layout Example
  10. Device and Documentation Support
    1. 9.1 接收文档更新通知
    2. 9.2 支持资源
    3. 9.3 Trademarks
    4. 9.4 静电放电警告
    5. 9.5 术语表
  11. 10Mechanical, Packaging, and Orderable Information

封装选项

机械数据 (封装 | 引脚)
散热焊盘机械数据 (封装 | 引脚)
订购信息

Application Curves

GUID-42935026-67B0-4014-9589-6916499958B4-low.gifFigure 8-2 Near End Eye Measurement Set-Up With Pre-Channel Cable
GUID-7DA339C2-3B13-4B3D-A75B-4017C595C54B-low.png
Figure 8-3 2 Meter Pre-Channel Without TUSB211A
GUID-BD935293-877D-4A41-B3FC-D482FA3B3D87-low.png
Figure 8-5 5 Meter Without TUSB211A
GUID-DC71C13C-CAC2-452D-AEF6-AE6EB5DF9EB6-low.png
Figure 8-7 5 Meter Pre-Channel With TUSB211A EQ=2
GUID-73A2302D-1858-4439-BE01-03CBAF5E3929-low.png
Figure 8-4 2 Meter Pre-Channel With TUSB211A EQ=1
GUID-74B3BE6F-1711-4754-9A37-9B4052BF6A43-low.png
Figure 8-6 5 Meter Pre-Channel With TUSB211A EQ=1
GUID-AA704C29-B2D9-4CA2-95CD-9E06AFA0A0B0-low.gifFigure 8-8 Near End Eye Measurement Set-Up With Post-Channel Cable
GUID-528BE490-5927-45B5-9F4C-E70458AD23E7-low.png
Figure 8-9 1 Meter Post-Channel Without TUSB211A
GUID-1F833079-B710-49B7-B422-DB20284EF02B-low.png
Figure 8-11 2 Meter Post-Channel Without TUSB211A
GUID-B026D8E3-209B-4886-9A44-72A505156B90-low.png
Figure 8-13 4 Meter Post-Channel Without TUSB211A
GUID-8A5B9148-9355-43E0-BCAC-4B81E419304D-low.png
Figure 8-10 1 Meter Post-Channel With TUSB211A EQ=0
GUID-91EAD0E6-3509-4465-95DC-55FA9C3CD941-low.png
Figure 8-12 2 Meter Post-Channel With TUSB211A EQ=1
GUID-B207137E-6A3C-4A5D-B9DE-64AFAF441484-low.png
Figure 8-14 4 Meter Post-Channel With TUSB211A EQ=2