SLUS829G August 2008 – February 2020 UCC2897A
PRODUCTION DATA.
From the power-stage design, the required turn-on delay (tDEL) of the gate-drive signals is defined. The corresponding RDEL resistor value to implement this delay is given by Equation 19 and Equation 20.
or