4 修订历史记录
Changes from C Revision (August 2016) to D Revision
- Changed Bus free time between start and stop specifications minimum from "4.7 μs" to "1.3 μs" in I2C/Smbus/PMBus Timing Requirements section Go
- Changed Hold time after (repeated) start, Repeated-start setup time, Stop setup time, and Clock high period specifications minimum from "0.26 μs" to "0.6 μs" in I2C/Smbus/PMBus Timing Requirements sectionGo
- Changed Data setup time specification minimum from "50 ns" to "100 ns" in I2C/Smbus/PMBus Timing Requirements sectionGo
- Changed Clock low period specification minimum from "0.5 μs" to "1.3 μs" in I2C/Smbus/PMBus Timing Requirements sectionGo
- Changed Clock/data fall time specification maximum from "120 ns" to "300 ns" in I2C/Smbus/PMBus Timing Requirements sectionGo
- Added Total capacitance of one bus line specification to I2C/Smbus/PMBus Timing Requirements sectionGo
- Clarified instructions in Programming section Go
- Updated Table 10Go
- Clarified Full Configuration Update While in Normal Mode sectionGo
- Added steps 6 through 9 in Design Requirements sectionGo
Changes from B Revision (December 2015) to C Revision
Changes from A Revision (August 2011) to B Revision
- Added 添加了引脚配置和功能 部分、ESD 额定值 表、特性 说明部分,器件功能模式,应用和实施部分,电源相关建议部分,布局部分,器件和文档支持部分以及机械、封装和可订购信息部分Go
- Changed minimum storage temperature from –40 to –55Go
- Changed the Functional Block DiagramGo
- Deleted the second paragraph under Monitoring sectionGo
- Updated Voltage Monitoring section.Go
- Updated pin numbers in GPIO Pin Configuration Options table.Go
- Updated first item in the GPI Special Functions section.Go
- Updated last sentence in Power-Supply Enables section.Go
- Updated JTAG INTERFACE section.Go
- Updated Programming section.Go