SLAA954 August   2020  – MONTH  TAS2563

 

  1.   Abstract
  2.   Trademarks
  3. 1End System Integration
    1. 1.1 Step 1: Exporting Binary and Configuration Files
    2. 1.2 Step 2: Configuration Selection
    3. 1.3 Step 3: Snapshot Selection
  4. 2Factory Test and Calibration (FTC)
    1. 2.1 Step 4: Pass/Fail Limits
    2. 2.2 Step 5: Configuration Summary
  5. 3Device Driver Integration
    1. 3.1 Case 1 : Initialization
    2. 3.2 Case 2: Power up
    3. 3.3 Case 3: New Configuration
    4. 3.4 Case 4: New Configuration and PLL
    5. 3.5 Case 5: New Configuration and Program
  6. 4Summary

Summary

This document serves as an overview of the End System Integration specifically for TAS2563. The End System Integration is the last step of the whole development process; however, PPC3 also offer “Tuning and debugging in System” option for direct tuning and debuggin after the device is integrated with the host system. For more information about the development process please refer to the TAS2563 Product page, TAS2563 Quick Start Guide, or visit us on the E2E Forum.