SLUUAQ0C October   2013  – November 2021 TPS53513

 

  1.   Trademarks
  2. Introduction
  3. Description
    1. 2.1 Typical Applications
    2. 2.2 Features
  4. Electrical Performance Specifications
  5. Schematic
  6. Test Setup
    1. 5.1 Test Equipment
    2. 5.2 Recommended Test Setup
      1. 5.2.1 Input Connections
      2. 5.2.2 Output Connections
  7. Configurations
    1. 6.1 Switching Frequency Selection
    2. 6.2 Mode Selection
    3. 6.3 VDD Pin Supply Selection
  8. Test Procedure
    1. 7.1 Line/Load Regulation and Efficiency Measurement Procedure
    2. 7.2 Control Loop Gain and Phase Measurement Procedure
    3. 7.3 List of Test Points
    4. 7.4 Equipment Shutdown
  9. EVM Assembly Drawing and PCB Layout
  10. List of Materials
  11. 10Revision History

Line/Load Regulation and Efficiency Measurement Procedure

  1. Set up the EVM as described in Section 5 and Figure 5-2.
  2. Ensure the load is set to constant resistance mode and to sink 0 ADC.
  3. Ensure all jumpers set per Section 6.
  4. Ensure the jumper provided in the EVM shorts on J2 before VIN is applied.
  5. Increase VIN from 0 V to 12 V. Using V1 to measure input voltage.
  6. Remove the jumper on J2 to enable the controller.
  7. Use V2 to measure VOUT voltage.
  8. Vary load from 0 ADC to 10 ADC, VOUT must remain in load regulation.
  9. Vary VIN from 8 V to 14 V, VOUT must remain in line regulation.
  10. Put the jumper on J2 to disable the converter.
  11. Decrease load to 0 A.
  12. Decrease VIN to 0 V.