SLVAFF2 July   2022 TPS92630-Q1

 

  1.   Abstract
  2.   Trademarks
  3. 1Introduction
    1. 1.1 Test Conditions
    2. 1.2 Test Setup Diagrams
  4. 2Test Results
  5. 3Conclusion
  6. 4References

Test Setup Diagrams

Figure 1-1 and Figure 1-2 show the loaded test and open test configurations, respectively. Figure 1-3 shows the EVM schematic with protection and testing modifications.

Figure 1-1 Loaded Test Configuration
Figure 1-2 Open Test Configuration
GUID-20220707-SS0I-RBNR-0STJ-5P6V7G8ZC4DF-low.png Figure 1-3 TPS92630EVM Schematic With Protection and Testing Modifications