SLVK120A may 2023 – may 2023 TPS7H1111-SP
PRODUCTION DATA
There were no functional failures at any irradiation level. All parametric measurements remained well within all data sheet limits for all exposure levels. The full parameter list is shown in Section 5 and the related data can be found in Appendix A.