SLVU642A
May 2012 – August 2021
TPS54526
Trademarks
1
Introduction
2
Performance Specification Summary
3
Modifications
3.1
Output Voltage Set Point
4
Test Setup and Results
4.1
Input / Output Connections
4.2
Start-Up Procedure
4.3
Efficiency
4.4
Light-Load Efficiency
4.5
Load Regulation
4.6
Line Regulation
4.7
Load Transient Response
4.8
Output Voltage Ripple
4.9
Input Voltage Ripple
4.10
Start-Up
5
Board Layout
5.1
Layout
6
Schematic, Bill of Materials and Reference
6.1
Schematic
6.2
Bill of Materials
6.3
Reference
7
Revision History
4.2
Start-Up Procedure
Make sure the jumper at JP1 (Enable control) is set from EN to OFF.
Apply appropriate VIN voltage to VIN and PGND terminals at J1.
Move the jumper at JP1 (Enable control) to cover EN and ON. The EVM will enable the output voltage.
千亿体育app官网登录(中国)官方网站IOS/安卓通用版/手机APP
|
米乐app下载官网(中国)|ios|Android/通用版APP最新版
|
米乐|米乐·M6(中国大陆)官方网站
|
千亿体育登陆地址
|
华体会体育(中国)HTH·官方网站
|
千赢qy国际_全站最新版千赢qy国际V6.2.14安卓/IOS下载
|
18新利网v1.2.5|中国官方网站
|
bob电竞真人(中国官网)安卓/ios苹果/电脑版【1.97.95版下载】
|
千亿体育app官方下载(中国)官方网站IOS/安卓/手机APP下载安装
|