SLVUC33 November 2021 TPS62442-Q1
To operate the EVM, set jumpers JP1, JP2, and JP3 to the desired positions per Section 2.1. Connect the input supply to J1 between VIN and GND. Connect the load to J2 between VOUT1 and GND and Connect the load to J3 between VOUT2 and GND.