On-Resistance (Ron) Test Setup

Figure 6-1 shows the typical setup for measuring on-resistance. The voltage drop across the switch is measured using the sense connections, and this can be divided by the load current to calculate the Ron resistance.

GUID-20210910-SS0I-GC9F-C0DX-FKM9MKLTDNQF-low.png Figure 6-1 Ron Test Setup