SNAU266A
July 2021 – August 2022
Abstract
1
First-Time Setup
1.1
Evaluation Module Contents
1.2
Evaluation Setup Requirements
2
EVM Connections
2.1
Connection Diagram
2.2
Power Supply
2.3
Reference Clock
2.4
Output Connections
2.5
Programming Interface
3
Feature Evaluation
3.1
Buffer, Divider, and Multiplier Modes
3.2
SYSREF Generation
3.3
SYSREF Delay Generators
4
Schematic
5
PCB Layout and Layer Stack-Up
5.1
PCB Layer Stack-Up
5.2
PCB Layout
6
Bill of Materials
A Troubleshooting
B USB2ANY Firmware Upgrade
C Revision History
5.2
PCB Layout
Figure 5-2
PCB Layer Plot - Top Layer
Figure 5-3
PCB Layer Plot - Layer 2 (RF GND)
Figure 5-4
PCB Layer Plot - Layer 3 (Signal GND 1)
Figure 5-5
PCB Layer Plot - Layer 4 (Signal GND 2)
Figure 5-6
PCB Layer Plot - Layer 5 (GND)
Figure 5-7
PCB Layer Plot - Bottom Layer
千亿体育app官网登录(中国)官方网站IOS/安卓通用版/手机APP
|
米乐app下载官网(中国)|ios|Android/通用版APP最新版
|
米乐|米乐·M6(中国大陆)官方网站
|
千亿体育登陆地址
|
华体会体育(中国)HTH·官方网站
|
千赢qy国际_全站最新版千赢qy国际V6.2.14安卓/IOS下载
|
18新利网v1.2.5|中国官方网站
|
bob电竞真人(中国官网)安卓/ios苹果/电脑版【1.97.95版下载】
|
千亿体育app官方下载(中国)官方网站IOS/安卓/手机APP下载安装
|