See Figure 2-1 for typical test setup. The functions of the test point connections are:
- VIN_EMI — Input supply to EVM.
- GND_EMI — Ground connection for the input supply.
- VIN — Input supply to the IC. Can be connected to a digital
multimeter to measure the input voltage after EMI filter.
- VOUT — Output voltage test point of EVM. Can be connected to a
desired load.
- GND — Ground test point.
- PG — This test point is connected to the PGOOD pin from the IC.
- SYNC — This test point can also be connected to an external clock
to synchronize the IC.
- GND— This test point represents
the analog ground test point and is connected to the ground plane.