TIDT202 September   2020

 

  1.   Description
  2. 1Test Prerequisites
    1. 1.1 Design Requirements
    2. 1.2 Required Equipment
    3. 1.3 Dimensions
  3. 2Testing and Results
    1. 2.1 Efficiency Graphs
    2. 2.2 Efficiency Data
    3. 2.3 Load Regulation
    4. 2.4 Thermal Images
  4. 3Waveforms
    1. 3.1 Switching
    2. 3.2 Output Voltage Ripple
    3. 3.3 Load Transients
    4. 3.4 Start-up Sequence
    5. 3.5 Undervoltage Protection
    6. 3.6 Thermal Management

Thermal Images

Thermal images are shown in the following figures. The ambient temperature is 25°C, and the thermal images were taken with all outputs at a full load of 3 A. The controller was operated for approximately 2 hours before thermal images were taken to ensure thermal steady state was reached.

GUID-20200910-CA0I-ZVJX-2R07-FSNLKBZ7NNPC-low.pngFigure 2-3 Top side
GUID-20200910-CA0I-TQDS-JDWX-HV9N00LBM24N-low.pngFigure 2-4 Bottom side