TIDT225 March   2021

 

  1. 1Description
  2. 2Test Prerequisites
    1. 2.1 Voltage and Current Requirements
    2. 2.2 Required Equipment
  3. 3Testing and Results
    1. 3.1 Thermal Images
    2. 3.2 Efficiency and Power Dissipation Graphs
    3. 3.3 Efficiency and Power Dissipation Data
    4. 3.4 Cross Regulation
    5. 3.5 Loop Gain
  4. 4Waveforms
    1. 4.1 Start-up
    2. 4.2 Switching Waveforms
    3. 4.3 Output Voltage Ripple
    4. 4.4 Load Transients

Required Equipment

  • Four loads (2 W each)
  • Power supply capable of 50 V and 1 A
  • Oscilloscope and probes
  • Digital multimeters
  • Stability measurement device (Venable or Bode100)