Loading UCC14240-Q1

To test the UCC14240-Q1, install J5 and connect a load between TP2 and TP9 (not between TP2 and TP5 or TP9 and TP5). Connect VIN to J1, Vbias to J2, and power up. After testing, remove power and load.