TIDT256A
March 2022 – March 2022
Description
Features
Applications
1
Test Prerequisites
1.1
LM5156-Q1
1.1.1
Loading LM5156-Q1
1.1.2
LM5156-Q1 SEPIC Bode Loop Testing
1.2
Loading UCC14240-Q1
1.3
UCC5870-Q1 and UCC5870-Q1 EVM GUI
1.4
Voltage and Current Requirements
1.5
Required Equipment
1.6
Considerations
1.7
Dimensions
2
Testing and Results
2.1
SEPIC Efficiency Graphs
2.2
SEPIC Efficiency Data
2.3
SEPIC Bode Plots
2.4
Thermal Images
3
Waveforms
3.1
SEPIC Switching
3.2
SEPIC Output Voltage Ripple
3.3
SEPIC Load Transients
3.4
SEPIC Start-Up Sequence
3.5
Isolated Bias Supply Start Up and Shutdown
3.6
Isolated Gate Drive
3.4
SEPIC Start-Up Sequence
Start-up behavior is shown in the following figures.
Green = V
IN
, Pink = V
OUT
Figure 3-11
Start-Up, V
IN
= 13-V No Load
Green = V
IN
, Pink = V
OUT
, Blue = Load Current
Figure 3-12
Start-Up, V
IN
= 13-V Load
千亿体育app官网登录(中国)官方网站IOS/安卓通用版/手机APP
|
米乐app下载官网(中国)|ios|Android/通用版APP最新版
|
米乐|米乐·M6(中国大陆)官方网站
|
千亿体育登陆地址
|
华体会体育(中国)HTH·官方网站
|
千赢qy国际_全站最新版千赢qy国际V6.2.14安卓/IOS下载
|
18新利网v1.2.5|中国官方网站
|
bob电竞真人(中国官网)安卓/ios苹果/电脑版【1.97.95版下载】
|
千亿体育app官方下载(中国)官方网站IOS/安卓/手机APP下载安装
|