TIDT280
May 2022
Description
Features
Applications
1
Test Prerequisites
1.1
Voltage and Current Requirements
1.2
Considerations
1.3
Dimensions
2
Testing and Results
2.1
Efficiency
2.2
Loss
2.3
Load Regulation
2.4
Line Regulation
2.5
Thermal Images
2.6
Bode Plots
2.6.1
9-V Input Voltage
2.6.2
24-V Input Voltage
2.6.3
48-V Input Voltage
2.6.4
56-V Input Voltage
3
Waveforms
3.1
Switching
3.1.1
Transistor Q5 (Low-Side FET)
3.1.1.1
Drain - Source
3.1.1.1.1
9-V Input Voltage
3.1.1.1.2
56-V Input Voltage
3.1.1.2
Gate - Source
3.1.1.2.1
9-V Input Voltage
3.1.1.2.2
56-V Input Voltage
3.1.2
Transistor Q1 (High-Side FET)
3.1.2.1
Source - Drain (Referenced to VIN)
3.1.2.1.1
9-V Input Voltage
3.1.2.1.2
56-V Input Voltage
3.1.2.2
Gate - Source
3.1.2.2.1
9-V Input Voltage
3.1.2.2.2
56-V Input Voltage
3.2
Output Voltage Ripple
3.3
Input Voltage Ripple
3.4
Load Transients
3.4.1
9-V Input Voltage
3.4.2
56-V Input Voltage
3.5
Start-Up Sequence
3.5.1
9-V Input Voltage
3.5.2
56-V Input Voltage
3.6
Shutdown Sequence
3.6.1
9-V Input Voltage
3.6.2
56-V Input Voltage
3.1.2
Transistor Q1 (High-Side FET)
千亿体育app官网登录(中国)官方网站IOS/安卓通用版/手机APP
|
米乐app下载官网(中国)|ios|Android/通用版APP最新版
|
米乐|米乐·M6(中国大陆)官方网站
|
千亿体育登陆地址
|
华体会体育(中国)HTH·官方网站
|
千赢qy国际_全站最新版千赢qy国际V6.2.14安卓/IOS下载
|
18新利网v1.2.5|中国官方网站
|
bob电竞真人(中国官网)安卓/ios苹果/电脑版【1.97.95版下载】
|
千亿体育app官方下载(中国)官方网站IOS/安卓/手机APP下载安装
|