TIDT300 August   2022

 

  1.   Description
  2.   Feature
  3.   Applications
  4. 1Test Prerequisites
    1. 1.1 Voltage and Current Requirements
    2. 1.2 Required Equipment
    3. 1.3 Considerations
  5. 2Testing and Results
    1. 2.1 Efficiency Graphs
    2. 2.2 Efficiency Data
    3. 2.3 Thermal Images
    4. 2.4 Bode Plots
  6. 3Waveforms
    1. 3.1 Switching
    2. 3.2 Voltage Ripple
    3. 3.3 Load Transients
    4. 3.4 Short-Circuit Protection
    5. 3.5 Start-Up Sequence

Considerations

  • All measurements were taken at approximately 25°C ambient
  • All measurements taken with 48-V input and 2.1-A load, unless noted