TIDT318 January   2023

 

  1.   Description
  2.   Features
  3.   Applications
  4. 1Test Prerequisites
    1. 1.1 Voltage and Current Requirements
    2. 1.2 Required Equipment
    3. 1.3 Considerations
    4. 1.4 Dimensions
    5. 1.5 Test Setup
  5. 2Testing and Results
    1. 2.1 Efficiency Graphs
    2. 2.2 Thermal Images
    3. 2.3 Bode Plots
  6. 3Waveforms
    1. 3.1 Switching
    2. 3.2 Load Transients

Test Setup

Figure 1-1 illustrates the test setup showing input power and output load connections, and output voltage being monitored with a digital volt meter (DVM).

GUID-20221228-SS0I-T0BP-Q6XN-GWG5HSSNRV9R-low.jpg Figure 1-1 Test Setup
CAUTION:

GUID-4C36832A-5C67-460B-94B5-813E05DCCD40-low.gif

Hot surface.
Contact can cause burns.
Do not touch!