  5. 1Test Prerequisites
    1. 1.1 Voltage and Current Requirements
    2. 1.2 Required Equipment
    3. 1.3 Dimensions
    4. 1.4 Test Setup
      1. 1.4.1 Hardware Setup
      2. 1.4.2 Firmware Setup
      3. 1.4.3 Test Static Operation
      4. 1.4.4 Test Soft-Start Process
      5. 1.4.5 Test Voltage Balance Performance
      6. 1.4.6 Test Bidirectional Transition Process
  6. 2Testing and Results
    1. 2.1 Efficiency Graphs
    2. 2.2 Efficiency Data
    3. 2.3 Thermal Images
  7. 3Waveforms
    1. 3.1 Switching
    2. 3.2 Bidirectional Transient
    3. 3.3 Start-Up Sequence

Test Static Operation

Use the following test procedure for forward charging mode operation:

  1. Connect the HV port to the 800V DC source, set the current limit to greater than 2A
  2. Connect the LV port to 12V E-load, set the load current smaller than 84A
  3. Power up the 12V bias power
  4. Gradually increase the HV source to 800V, less than 1V / ms.

Use the following test procedure for backward discharging mode operation:

  1. Connect the LV port to the 12V DC source, set the current limit to greater than 100A
  2. Connect the HV port to the E-load, set the load current smaller than 1.4A
  3. Power up the 12V bias power
  4. Gradually increase the DC source to 12V (Note: the testing in this report is using 9V because the E-load is limited by 600V)