TIDUEB2A July 2022 – July 2022
This section describes the test procedures used to verify the functionality of this design. Test results for Charge Current Limiting, Battery ORRing, and Adapter or Battery Switchover are shown, and the procedures used during the testing are discussed.
All tests run in this section follow the connections in Table 3-3, unless otherwise stated.