ZHCSFF5G July 2016 – December 2019 TPS2660
PRODUCTION DATA.
To begin the design process, the designer needs to know the following parameters:
This design procedure below seeks to control junction temperature of the device in both steady state and start-up conditions by proper selection of the output ramp-up time and associated support components. The designer can adjust this procedure to fit the application and design criteria.