SNLA466
August 2024
DP83822I
,
DP83826E
,
DP83826I
,
DP83867E
,
DP83867IR
,
DP83869HM
1
Abstract
Trademarks
1
Abbreviation
2
Introduction
3
EMC Emission
3.1
Radiated Emission
3.1.1
Test Setup for Radiated Emission Test
3.1.2
Main Radiated Emission Sources
3.2
Conducted Emission
3.2.1
Test Setup for Conducted Emission Test
3.2.2
Main Conducted Emission Sources
3.3
Debug Procedure on EMC Emission
3.3.1
General Debug Procedure
3.3.2
RE Specific Debug
3.3.3
CE Specific Debug
4
EMC Immunity Test
4.1
EMI Passing Criteria
4.2
Common EMI Knowledge
4.3
IEC61000 4-2 ESD
4.3.1
ESD Test Setup
4.3.2
Possible Root Cause of Failure
4.3.3
Debug Procedure
4.3.3.1
Follow the Test Setup
4.3.3.2
Remove External Factors on Cable or Link Partner
4.3.3.3
Areas to Explore to Improve ESD Performance
4.3.3.3.1
Air or Capacitive Coupling Discharge ESD Recommendations
4.3.3.3.2
Direct Contact Discharge ESD Recommendation
4.3.3.4
Schematic and Layout Recommendations
4.4
IEC 61000 4-3 RI
4.4.1
RI Test Setup
4.4.2
Possible Root Cause of Failure
4.4.3
Debug Procedure
4.4.3.1
Follow RI Test Setup
4.4.3.2
Remove External Factor on Cable or Link Partner
4.4.3.3
Found out Main Emission Area
4.4.3.4
Schematic and Layout Recommendation
4.5
IEC 61000 4-4 EFT
4.5.1
EFT Test Setup
4.5.2
Possible Root Cause of Failure
4.5.3
Debug Procedure
4.5.3.1
Follow EFT Test Setup
4.5.3.2
Remove External Factor on Cable or Link Parnter
4.5.3.3
Areas to Explore to Improve EFT Performance
4.5.3.4
Schematic and Layout Recommendation
4.6
IEC 61000 4-5 Surge
4.6.1
Surge Test Setup
4.6.2
Possible Root Cause of Failure
4.6.3
Debug Procedure
4.6.3.1
Follow Surge Test Setup
4.6.3.2
Remove External Factor on Cable or Link Partner
4.6.3.3
Area to Explore to Improve Surge Performance
4.6.3.4
Schematic and Layout Recommendation
4.7
IEC 61000 4-6 CI
4.7.1
CI Test Setup
4.7.2
Possible Root Cause of Failure
4.7.3
Debug Procedure
4.7.3.1
Follow CI Test Setup
4.7.3.2
Remove External Factors on Cable or Link Partner
4.7.3.3
Areas to Explore to Improve CI Performance
4.7.3.4
Schematic and Layout Recommendation
5
Schematic and Layout Recommendation for All EMC, EMI Tests
5.1
Schematic Recommendation
5.2
Layout Recommendation
6
Summary
7
References
Application Note
Optimizing EMC Performance in Industrial Ethernet Application
千亿体育app官网登录(中国)官方网站IOS/安卓通用版/手机APP
|
米乐app下载官网(中国)|ios|Android/通用版APP最新版
|
米乐|米乐·M6(中国大陆)官方网站
|
千亿体育登陆地址
|
华体会体育(中国)HTH·官方网站
|
千赢qy国际_全站最新版千赢qy国际V6.2.14安卓/IOS下载
|
18新利网v1.2.5|中国官方网站
|
bob电竞真人(中国官网)安卓/ios苹果/电脑版【1.97.95版下载】
|
千亿体育app官方下载(中国)官方网站IOS/安卓/手机APP下载安装
|