4 Revision History
Changes from Revision C (November 2020) to Revision D (April 2021)
- Corrected the wrong pin diagram image that was tagged incorrectly
during system migrationGo
Changes from Revision B (April 2020) to Revision C (November 2020)
- 更新了整个文档的表、图和交叉参考的编号格式Go
- 向器件信息 表中添加了 VQFN (16) 封装Go
- Updated the RHF package in the Pin Configuration and
Functions sectionGo
- Added the RGT package in the Pin Configuration and Functions
sectionGo
Changes from Revision A (December 2019) to Revision B (April 2020)
- 向器件信息表添加了晶圆销售封装和封装尺寸(标称值)Go
- Added the YS Die bondpad and functionsGo
- Updated Table 1 BIAS-1 and BIAS-2 Logic TableGo
- Added Wafer and Die Information sectionGo
Changes from Revision * (August 2019) to Revision A (December 2019)