Soft start directly controls the output start-up time and indirectly controls the output current during start-up (in-rush current).
The external capacitor at the NR/SS pin (CNR/SS) sets the output start-up time by setting the rise time of the internal reference (VNR/SS), as illustrated in Figure 7-4.